At the start of the project’s design process [design] [build] by architects utilizes 3d modeling in order to conceptualize programming and schematic design with the client.  The interactive design approach allows the client to become part of the design team.   The bonding time created between the client and DBBA staff allows DBBA to extract the client’s intentions early on in the project’s life.   Interactive design also enables the client to visualize the design before construction.